{"id":8939,"date":"2005-10-05T09:17:33","date_gmt":"2005-10-05T09:17:33","guid":{"rendered":"https:\/\/aiguasol.coop\/project\/evaluacion-energetica-del-masterplan-de-zaha-hadid-para-el-nuevo-barrio-de-zorrotzaurre-en-bilbao\/"},"modified":"2023-06-17T07:59:40","modified_gmt":"2023-06-17T07:59:40","slug":"avaluacio-energetica-del-masterplan-de-zaha-hadid-per-al-nou-barri-de-zorrotzaurre-a-bilbao","status":"publish","type":"portfolio","link":"https:\/\/aiguasol.coop\/ca\/project\/avaluacio-energetica-del-masterplan-de-zaha-hadid-per-al-nou-barri-de-zorrotzaurre-a-bilbao\/","title":{"rendered":"Avaluaci\u00f3 energ\u00e8tica del Master Plan de Zaha Hadid per al nou barri de Zorrotzaurre a Bilbao."},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row row_height_percent=\u00bb0&#8243; override_padding=\u00bbyes\u00bb h_padding=\u00bb2&#8243; top_padding=\u00bb3&#8243; bottom_padding=\u00bb2&#8243; overlay_alpha=\u00bb50&#8243; gutter_size=\u00bb3&#8243; shift_y=\u00bb0&#8243;][vc_column width=\u00bb1\/1&#8243;][vc_column_text]AIGUASOL va participar l&#8217;any 2005, sota la figura de consultor energ\u00e8tic, en el desenvolupament definitiu del Master Plan de Zorrotzaurre (Bilbao). El Master Plan original dissenyat per Zaha Hadid Architects, inclo\u00efa la remodelaci\u00f3 i construcci\u00f3 d&#8217;habitatges, noves ind\u00fastries, usos terciaris, zones urbanes i espais d&#8217;esbarjo i les noves connexions que uneixen la pen\u00ednsula, la ciutat i els seus voltants.<\/p>\n<p>Un dels reptes del projecte era la creaci\u00f3 d&#8217;un model amb un consum d&#8217;energia dels edificis que fos inferior al consum est\u00e0ndard en planejament urb\u00e0 i al d&#8217;edificis de nova construcci\u00f3 que acomplissin la legislaci\u00f3 vigent.<\/p>\n<p>AIGUASOL es va encarregar d&#8217;introduir el vector energia al disseny preliminar, tot estudiant els  par\u00e0metres lliures:  altura i dist\u00e0ncia entre edificis, orientaci\u00f3 i distribuci\u00f3 d&#8217;usos al nou barri. L&#8217;objectiu era reduir l&#8217;impacte energ\u00e8tic de l&#8217;actuaci\u00f3 completa sense incidir encara als edificis en detall ni als sistemes energ\u00e8tics.<\/p>\n<p>Per a aix\u00f2 es van fer les an\u00e0lisis pertinents en emprar les dades provisionals del Master Plan original i simulacions din\u00e0miques. Es va simular en detall l&#8217;altura dels edificis i l&#8217;amplada de carrer, sense modificar en cap cas la superf\u00edcie total constru\u00efda, l&#8217;orientaci\u00f3 dels edificis i la distribuci\u00f3 correcta d&#8217;usos a tota l&#8217;\u00e0rea de l&#8217;actuaci\u00f3, considerant el tipus diferenciat de demandes de les oficines i terciari en relaci\u00f3 a habitatges.<\/p>\n<p>Optimitzant aquests par\u00e0metres es va arribar a un estalvi energ\u00e8tic del 18% respecte al disseny original, demostrant la potencialitat de les actuacions a aquestes fases d&#8217;ordenament.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-4170\" src=\"\/wp-content\/uploads\/2016\/10\/Zorrotzaurre-02.jpg\" alt=\"zorrotzaurre-02\" width=\"1920\" height=\"796\" srcset=\"https:\/\/aiguasol.coop\/wp-content\/uploads\/2016\/10\/Zorrotzaurre-02.jpg 1920w, https:\/\/aiguasol.coop\/wp-content\/uploads\/2016\/10\/Zorrotzaurre-02-600x249.jpg 600w, https:\/\/aiguasol.coop\/wp-content\/uploads\/2016\/10\/Zorrotzaurre-02-300x124.jpg 300w, https:\/\/aiguasol.coop\/wp-content\/uploads\/2016\/10\/Zorrotzaurre-02-768x318.jpg 768w, https:\/\/aiguasol.coop\/wp-content\/uploads\/2016\/10\/Zorrotzaurre-02-1024x425.jpg 1024w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>D&#8217;aquesta manera es van establir les bases per a un desenvolupament posterior d&#8217;ordenances espec\u00edfiques per a la zona, aix\u00ed com d&#8217;una primera valoraci\u00f3 dels sistemes energ\u00e8tics de barri.<\/p>\n<p>Considerant que els barris CONCERTO de la UE han de tenir un consum d&#8217;energia prim\u00e0ria un 30% inferior al d&#8217;un barri que acompleixi la normativa espec\u00edfica del pa\u00eds, l&#8217;estalvi del 18% aconseguit amb una m\u00ednima inversi\u00f3, deixa moltes possibilitats en fases posteriors per poder aconseguir l&#8217;objectiu d&#8217;ecobarri.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Optimitzant aquests par\u00e0metres es va arribar a un estalvi energ\u00e8tic del 18% respecte al disseny original, demostrant la potencialitat de les actuacions a aquestes fases d&#8217;ordenament.<\/p>\n","protected":false},"author":1229,"featured_media":4168,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"slim_seo":{"title":"Avaluaci\u00f3 energ\u00e8tica del Master Plan de Zaha Hadid per al nou barri de Zorrotzaurre a Bilbao. - Aiguasol","description":"Optimitzant aquests par\u00e0metres es va arribar a un estalvi energ\u00e8tic del 18% respecte al disseny original, demostrant la potencialitat de les actuacions a aquest"},"_slim_seo_primary_term_portfolio_category":0,"footnotes":""},"portfolio_category":[162],"class_list":["post-8939","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-politica-energetica-ca"],"_links":{"self":[{"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/portfolio\/8939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/users\/1229"}],"replies":[{"embeddable":true,"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/comments?post=8939"}],"version-history":[{"count":0,"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/portfolio\/8939\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/media\/4168"}],"wp:attachment":[{"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/media?parent=8939"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/aiguasol.coop\/ca\/wp-json\/wp\/v2\/portfolio_category?post=8939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}